Ask a data center question. Get a straight answer.
Send us a question about capacity, power, land, gear, crews or the money side. We answer the useful ones publicly, without your name. Below are explainers the Desk wrote to start.
Explainers written by the Desk
These are the Desk’s own explainers, not reader-submitted questions.
What is the difference between retail and wholesale colocation?
Retail colocation sells space and power in small units, like cabinets, cages or small suites, with the provider running the facility. Wholesale sells larger blocks, usually whole data halls measured in megawatts, often with longer terms.
Read the answer →Desk answerHow much power does a GPU rack need?
It depends on the system. Published vendor specs range from about 10 kW for one 8-GPU Hopper server to about 120 kW for a full GB200 NVL72 rack.
Read the answer →Desk answerCan I sublease data center space I am not using?
Often yes, but most leases require the landlord’s consent first. Check your lease, then describe the usable power, remaining term and consent status when you list.
Read the answer →Desk answerWhy does it take so long to get grid power for a data center?
Large loads need utility studies, new substations or transmission, and equipment with long lead times, and many projects are in the same queue.
Read the answer →Desk answerWhat should I check before buying used GPUs or servers?
Confirm title and serial numbers, a documented data sanitization record, export-control status, test results and how the gear was used and cooled.
Read the answer →